…where excellence, innovation and integrity work for you every day.
WATER
Camp Meeker Water Supply and System
Click thumbnail to enlarge

Key Project Elements

  • Hydraulics Analysis
  • Site Improvements
  • Production Monitoring
  • Tie-in to Existing Distribution System
  • SCADA and Telemetry

Project: Camp Meeker Water Supply and System

Client: Camp Meeker Park and Recreation District

Camp Meeker had long been plagued with water quality and shortage problems. Brelje & Race prepared the environmental document, grant funding application, preliminary design report, design drawings, and specifications for the construction of the new water supply source and 5.5-mile transmission pipeline from Monte Rio to Camp Meeker on the Bohemian Highway. Brelje & Race also acted as project administrator, providing the full range of construction administration services. The second phase included design drawings, specifications, and construction inspection for replacement of the entire existing distribution system. The project totaled over $5.5 million, nearly half of which was derived from grant funding.