WATER
Project:
Camp Meeker Water Supply and System
Client:
Camp Meeker Park and Recreation District
Camp Meeker had long been plagued with water quality and
shortage problems. Brelje & Race prepared the environmental
document, grant funding application, preliminary design report,
design drawings, and specifications for the construction of the
new water supply source and 5.5-mile transmission pipeline from
Monte Rio to Camp Meeker on the Bohemian Highway. Brelje & Race
also acted as project administrator, providing the full range of
construction administration services. The second phase included
design drawings, specifications, and construction inspection for
replacement of the entire existing distribution system. The
project totaled over $5.5 million, nearly half of which was
derived from grant funding.
|
|